Project Overview
Cincinnati Public Radio partnered with our team to integrate renewable energy into its facility through a ballasted, roof-mounted solar installation. The project was designed to support the organization’s sustainability goals while contributing to its pursuit of LEED certification.
The Challenge
As part of a broader commitment to environmental stewardship and operational sustainability, Cincinnati Public Radio sought an energy solution that would reduce its environmental impact and align with green building standards. The system needed to be installed without compromising the integrity of the existing roof structure while supporting the facility’s long-term performance objectives.
The Solution
Our team designed and installed a ballasted rooftop solar array that met the project’s technical and sustainability requirements. The non-penetrating mounting system provided an effective solution for the building’s roof while maximizing renewable energy production and supporting LEED certification goals.
Results
The completed solar installation became a key component of the building’s LEED certification strategy, helping Cincinnati Public Radio demonstrate its commitment to sustainable operations and environmental leadership. By investing in clean energy, the organization enhanced its sustainability profile while reducing reliance on traditional energy sources.








