New Albany Service Garage
Project Overview Kokosing Solar partnered with the City of New Albany to deliver a rooftop solar installation at the city’s Public Service Facility, supporting the

Project Overview Kokosing Solar partnered with the City of New Albany to deliver a rooftop solar installation at the city’s Public Service Facility, supporting the

System Size – 673.96 kW of solar installed across 6 CML branches. Date – Installation completed in 2023. Real Time Monitoring – Each facility includes

Project Overview Kokosing Solar partnered with the City of Grandview Heights to deliver solar carport canopies for its new City Hall, Police, and Fire Municipal

Project Overview Cincinnati Public Radio partnered with our team to integrate renewable energy into its facility through a ballasted, roof-mounted solar installation. The project was

Size – 69.6 kW DC Energy production – The system is expected to generate 85,283 kWh annually, offsetting 15% of building use Date – 2025

Scope of work – Mechanical, Civil Work Size – 418-acre solar field Subcontractor Date – Kokosing scope of work complete in 2026 As the civil

Denison Universityโs newest solar installation began producing energy in June 2026. This represents a major milestone in our longstanding partnership with the university. After our

SYSTEM SIZE- 2.5 MW DC DATE – Installation completed in 2026 DESIGN WORK – Civil design in house, electrical design The Blackman Solar Gardens is

SYSTEM SIZE- 2.3 MW DC DATE – Installation completed in 2025 ENERGY TARGET – 48% energy offset Festo Corporation, a global leader in industrial automation

SYSTEM SIZE- 1.5 MW DC of solar installed DATE – Installation completed in 2025 DESIGN WORK- In-house design PROJECT FINANCING – PPA with IGS Energy
Ohioโs energy landscape is shifting rapidly. With PUCOโapproved rate increases and evolving statewide policies, organizations across the state are facing higher operating costs and new

Key Federal Deadlines for the 30% ITC and FEOC Compliance (2025โ2027)ย The next two years represent one of the most timeโsensitive periods in the history

Ohio Protects Net Metering: What This Win Means for Solar Customers and the Stateโs Energy Futureย Net metering has long been one of Ohioโs most

The Ottawa County Board of Commissioners and the Ottawa County Sanitary Engineering Department are pleased to announce the completion of the Danbury Wastewater Reclamation Plant

What Does the AI Boom Mean for Your Electric Bill in Ohio?ย Artificial intelligence (AI) has been making headlines everywhereโfrom smart tools that write and

Ohio EPAโs Water Pollution Control Loan Fund (WPCLF) The Water Pollution Control Loan Fund (WPCLF) provides financial assistance to public entities for projects that protect and

Blackman Solar Garden Groundbreaking BLACKMAN TOWNSHIP, Mich., May 2, 2025 โ Kokosing Solar joined local leaders, Consumers Energy representatives, and members of the Jackson County

Athens City Schools Solar Project Overview Project Overview In 2024, Kokosing Solar completed successful rooftop solar installations for the Athens City Schools, at East Elementary,

ย akron church rooftop solar project The Unitarian universalist Church of Akron, Ohio put their faith into action and installed 44 Hanwha solar modules on

On July 31, 2024, PJM, the regional transmission organization responsible for coordinating wholesale electricity movement in Ohio, announced a significant increase in capacity charges that